Skip to main content

Search results for "computational precision"

Filters: Construction Construction ×
Viewing 1 - 20 of 140 results by relevance

Precision Estimates of AASHTO T 242  (2009)

Precision Statements for AASHTO Standard Methods of Test T 148, T 265, T 267, AND T 283  (2011)

Precision Estimates of AASHTO T 324, “Hamburg Wheel-Track Testing of Compacted Hot Mix Asphalt (HMA)”  (2014)

Precision Estimates of Selected Volumetric Properties of HMA Using Absorptive Aggregate  (2007)

Precision Estimates for AASHTO Test Method T 269 Determined Using AMRL Proficiency Sample Data  (2007)

Precision Estimates for AASHTO Test Method T 105, Determined Using CCRL Proficiency Sample Data  (2009)

Precision Estimates for AASHTO Test Method T 104, Determined Using AMRL Proficiency Sample Data  (2009)

Precision Estimates for AASHTO Test Methods T 186, T 154, and T 22, Determined Using CCRL Proficiency Sample Data  (2009)

Guidelines for Analysis Methods and Construction Engineering of Curved and Skewed Steel Girder Bridges  (2012)

Use of Automated Machine Guidance within the Transportation Industry  (2018)

Mitigation of Weldment Cracking in Steel Highway Structures Due to the Galvanizing Process  (2021)

Recommended AASHTO Guide Specifications for ABC Design and Construction  (2018)

Consensus Study Report

The Owner's Role in Project Risk Management  (2005)

Development of a Recommended Practice for Use of Controlled Low-Strength Material in Highway Construction  (2008)

Effective Slab Width for Composite Steel Bridge Members  (2005)

Field Performance of Corrugated Pipe Manufactured with Recycled Polyethylene Content  (2018)

State Construction Quality Assurance Programs  (2005)

Corrosion Study and Implementation Plan for NCHRP Report 597  (2008)

Appendixes to NCHRP Report 573: Superpave Mix Design: Verifying Gyration Levels in the Ndesign Table  (2006)