Skip to main content

Search results for "modified stage"

Viewing 1 - 20 of 50 results by relevance

Evaluating Applications of Field Spectroscopy Devices to Fingerprint Commonly Used Construction Materials  (2013)

Identification of Utility Conflicts and Solutions: Pilot Implementation of the SHRP 2 R15B Products at the Maryland State Highway Administration  (2014)

Evaluating Applications of Field Spectroscopy Devices to Fingerprint Commonly Used Construction Materials (Phase IV–Implementation)  (2014)

Innovative Bridge Designs for Rapid Renewal  (2014)

Development of the Geoconstruction Information and Technology Selection Guidance System  (2014)

Guide to Using Existing Pavement in Place and Achieving Long Life  (2014)

Communicating Railroad–DOT Mitigation Strategies  (2014)

Integrated Delivery of SHRP 2 Renewal Research Projects  (2014)

Developing the "Guide for the Process of Managing Risk on Rapid Renewal Projects"  (2014)

Tools for Communicating Railroad-DOT Mitigation Strategies  (2014)

Innovative Bridge Designs for Rapid Renewal Toolkit  (2012)

2008 Survey of European Composite Pavements  (2010)

Encouraging Innovation in Locating and Characterizing Underground Utilities  (2009)

Innovations to Locate Stacked or Deep Utilities  (2014)

Nondestructive Testing to Identify Concrete Bridge Deck Deterioration  (2012)

Nondestructive Testing to Identify Delaminations Between HMA Layers: Phase III–Develop User Guidelines  (2014)

A Plan for Developing High-Speed, Nondestructive Testing Procedures for Both Design Evaluation and Construction Inspection  (2009)

Pilot Testing of SHRP 2 Reliability Data and Analytical Products: Washington  (2014)

Geotechnical Solutions for Soil Improvement, Rapid Embankment Construction, and Stabilization of the Pavement Working Platform  (2012)

Identification of Utility Conflicts and Solutions  (2012)