Skip to main content

Search results for "fiscal consequences"

Viewing 1 - 20 of 31 results by relevance

Identification of Utility Conflicts and Solutions  (2012)

Integrated Delivery of SHRP 2 Renewal Research Projects  (2014)

Pre-Implementation of Infrared and Ground-Penetrating Radar Technologies for Improving Asphalt Mixture Quality  (2014)

Tools for Communicating Railroad-DOT Mitigation Strategies  (2014)

Communicating Railroad–DOT Mitigation Strategies  (2014)

Identification of Utility Conflicts and Solutions: Pilot Implementation of the SHRP 2 R15B Products at the Maryland State Highway Administration  (2014)

Using Infrared and High-Speed Ground-Penetrating Radar for Uniformity Measurements on New HMA Layers  (2012)

Developing the "Guide for the Process of Managing Risk on Rapid Renewal Projects"  (2014)

A Plan for Developing High-Speed, Nondestructive Testing Procedures for Both Design Evaluation and Construction Inspection  (2009)

Utility-Locating Technology Development Using Multisensor Platforms  (2014)

Encouraging Innovation in Locating and Characterizing Underground Utilities  (2009)

Nondestructive Testing to Identify Concrete Bridge Deck Deterioration  (2012)

Guide to Using Existing Pavement in Place and Achieving Long Life  (2014)

Innovative Bridge Designs for Rapid Renewal Toolkit  (2012)

Innovative Bridge Designs for Rapid Renewal  (2014)

Strategic Approaches at the Corridor and Network Level to Minimize Disruption from the Renewal Process  (2013)

Project Management Strategies for Complex Projects: Case Study Report  (2014)

Strategies for Improving the Project Agreement Process between Highway Agencies and Railroads  (2010)

Bridges for Service Life Beyond 100 Years: Innovative Systems, Subsystems, and Components  (2014)

Guide to Project Management Strategies for Complex Projects  (2013)